Truck Tunnel Moves Towards Environmental Assessment Stage
posted in: Transportation - Sandy Hill Specific
The release of the Downtown Tunnel Feasibility Study occurred in Aug 2016 (delayed from Q1 2016). This Study examined several possible routes for a 417 to Macdonald-Cartier bridge tunnel and concluded that a tunnel was technically feasible. The recommended route … Read More